- SAP PP Tutorial
- SAP PP - Home
- SAP PP - Introduction
- SAP PP - Common Tables
- SAP PP - Organization Structure
- Integration with Other Modules
- SAP PP - Master Data
- SAP PP - Bill of Materials
- SAP PP - Work Center
- SAP PP - Routing
- SAP PP - Demand Management
- SAP PP - Creating PIR
- Material Requirement Planning
- SAP PP - MRP List
- SAP PP - Long Term Planning
- SAP PP - Production Orders
- SAP PP - Production Order Change
- Production Order Confirmation
- Canceling Production Order
- SAP PP - Capacity Planning
- SAP PP - Capacity Leveling
- SAP PP - Goods Receipt
- SAP PP - Stock Overview
- SAP PP - Goods Issue
- SAP PP - Goods Issue Reversal
- SAP PP - Lean Manufacturing
- SAP PP - Reports
- SAP PP - Material Document List
- Stock of Multiple Materials
- List in Bill of Material
- SAP PP Useful Resources
- SAP PP - Questions Answers
- SAP PP - Quick Guide
- SAP PP - Useful Resources
- SAP PP - Discussion
- Selected Reading
- UPSC IAS Exams Notes
- Developer's Best Practices
- Questions and Answers
- Effective Resume Writing
- HR Interview Questions
- Computer Glossary
- Who is Who
SAP PP Online Quiz
Following quiz provides Multiple Choice Questions (MCQs) related to SAP PP. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.
Q 1 - In which of the Production type, produce materials changed with each lot and costs are calculated as per orders and lots?
Answer : B
Explanation
Discrete production is known as industry where produce materials changed with each lot and costs are calculated as per orders and lots.
In Repetitive production, product is not changed for longer time period and production is done as total quantity and not in the form of individual lots.
Q 2 - When you create a Material BOM without a Plant is known as?
Answer : C
Answer : A
Q 4 - Which of the following movement type is used for Goods Receipt in to Warehouse?
Answer : A
Q 5 - Long Term Planning is not actual run but is used to see if all capacity requirement can be fulfilled and you can also transfer simulative area to operative area if requirements are fulfilled?
Answer : A
Explanation
Long term planning in SAP PP is used to check future demands at all Bill of Material level. You can check the current capacity and vendor ability to provide the material in required time period.
This is not actual run but is used to see if all capacity requirement can be fulfilled and you can also transfer simulative area to operative area if requirements are fulfilled.
Q 6 - Using T-Code CO01, you can create a Production order without referring planned order?
Answer : A
Explanation
Answer : B
Explanation
NetChange in planning horizon −
This run considers the requirement in predefined planning horizon and not like net change which check the future requirements.
In this run, system consider only those material which has undergone some changes from their last MRP run.
Q 8 - When raw material is consumed to produce material as per Production order, to perform goods issue movement type is?
Answer : C
Explanation
In SAP PP, goods issue is done when raw material is consumed to produce material as per Production order. When goods are issued, system decreases the inventory of components at the storage location in Production Planning system.
Movement type 261 is used for goods issue.
Q 9 - Which of the following report is used to collect information about hierarchy of work center of a shift?
Answer : B
Q 10 - To set your PIR version active, which of the below value should be used to specify requirement would be considered in material requirement planning?
Answer : A
Explanation
In SAP PP, demand management is performed by Planned Independent requirement PIR. Planned Independent requirement provides input for production planning. A PIR contains one planned quantity of product and one date for material or a planned quantity is split over a span of time period.
To set your PIR version active use value 00 to specify requirement would be considered in material requirement planning. To maintain number of versions of planned independent requirement, you can set some numbers to active and others to inactive.